SP-Tech says delivery dates will not be impacted. This means that hashrate will be constained by the 2400W power envelope; power supplies have already been qualified.
So if, for example, the chip needs 0.8W/GH at the system level then the SP30 will be a 3TH/s box drawing 2400W. If it is 0.6W/GH then you can have 4TH/s in the same box.
good points.
so if delivery is on time.
the question is does the gear do 5th or 4th?
5th would call for 17% refund
4th would call for 33% refund.