Post
Topic
Board Hardware
Re: HashFast announces specs for new ASIC: 400GH/s
by
jtoomim
on 02/09/2014, 05:28:07 UTC
We likely pay 2X your electric price in the US and 3.28X your electric price in asia on our mines and I actually think you will learn some lessons when you start approaching 1000 amps that may surprise you. 
The HVAC cost is not as much as you imagine with the swamp coolers you are using.

I know the HVAC costs aren't much with swamp coolers. I'm guessing HVAC costs would probably add about 30% to 50% to your total power bill, since most air conditioners have a coefficient of performance between 2.0 and 3.8.

1000 amps of what? 208V 3-phase? 120V single-phase? If so, we already have more power than that installed. We currently have 800 amps of 480V 3-phase worth of capacity installed, with another 600 amps half-done. Anyway, I'm not here to attempt to steal the show, I'm just curious about dryleaf's setup.