Not to bad actually. They are running around 80 C and we have about 160 ton of AC on the building so its pretty cold most of the time.  Smiley
Just out of curiosity, who is paying the electricity on that? Who pays for the air conditioning?
I think you would be surprised about costs.   I looked at your design and it is interesting and your cost structure is also interesting.    But there are also other ways to run a mine profitably.   We likely pay 2X your electric price in the US and 3.28X your electric price in asia on our mines and I actually think you will learn some lessons when you start approaching 1000 amps that may surprise you. 
The HVAC cost is not as much as you imagine with the swamp coolers you are using.

We are currently using around 1600 amps in this building. And you are correct there are some surprises you will run into on the way if you arent careful.