Post
Topic
Board Hardware
Re: Liquid Cooled Miner C1 Discussion and Support Thread
by
notlist3d
on 22/11/2014, 10:38:02 UTC
Has anyone received their RMA parts from syscooling?  (They used EMS shipping on me)

I started talking to them on Nov 7th and its now Nov 22 still no replacement.   That is about half a month.  I had to buy adapter and pumps for each of my C1's to get up and running (In it around another 100 dollars).  
Which pump did you finally end up buying and how are they working.


They are working great on pumps.  There could be a better place depending where you live, went to ebay and sorted by items in US (I am in US and did not want to wait for pump to come from china).  The pump with original set is 450 L/H. Make sure to go with 450L/H or higher, the one I went with was 500L/H.  I also went for pins so I could plug the 3 fans and pump into a molex to 3 pin power connecter.

Pump:
http://www.ebay.com/itm/380693788606?_trksid=p2059210.m2749.l2649&ssPageName=STRK%3AMEBIDX%3AI

Molex to 3 pin adapter (To use instead of syscooling harness):
http://www.amazon.com/Phobya-4-Pin-3-Pin-Splitter-Connection/dp/B007S3T4O0/ref=sr_1_3?ie=UTF8&qid=1416652659&sr=8-3&keywords=molex+to+fan