Ia I said before we are working on this project for almost 6 moths. This is DESIGN.
And that's the problem. You're at the design phase. You cannot ship a working miner in 2 months from now that comes anywhere close to the specifications you are claiming.
This looks like deja vu all over again. AMT pulled the same crap at around the same time frame.
Again being nice here, but EMIC you REALLY gotta pull out all stops and show us. OR take a step back and ask yourself if your expectations are realistic. Considering you APPEAR to be making an original design, I dont see how 2 months is realistic when even giant chipmakers like Intel and AMD take months to come out with new chips and refresh their lines after a year almost in many cases. The so-called malcontents have been through this rodeo a number of times, and in 90 percent of the cases the so-called manufacturer turns out to be full of it. What makes you different? Again valid question.
If you are working on your own designs, who are you using for manufacturing?
Do you have ANY units available for testing? (at this point there should be at least a prototype as shipping would be close to end of January). QA testing at this point would have been something to be doing.