I miss the days when Bitmain mining gear would pay for itself in 6 or less weeks of mining. I just can't get over having to assume the risk for payback over 3 months.
if these were 2TH I would be all over these as I would just pump cold water from the fish pond outside and pump the hot water back out. No fans or radiators.
1 BTC each plus shipping plus local taxes are just a losing proposition.
good luck all the same to all who are biting. hope BTC hits over 1000 again this November to break you all into ROI.