My Russian may be a bit rusty, but a total container (without ASICs) from Allied Control is much less than $1 million, not the stated $1.2 to $1.5 million in your post.
As far as I know the Asicminer Gen-3 chips (BE 200) in a 2-3PH container as finished mining solution is less than $900/TH and that includes everything, including power, networking, delivery, etc. The miner needs to plugin power and internet on the outside and the mining can begin. The discussion of air cooling vs. immersion cooling is obsolete, it is a matter of delivery.
ok. 6 rack 3*1*1~1,2=3~3,6 m^3. high density, filling 70%, arround 5,4~6,48 m^3. 1 liter $ 50. 270000$-324000$ only liquid.
V-cooler 8 pieces around 150000$.
6 Rack, container, pumps, fire system protection and other parts 200000$
salary workers: 10000-15000$.
Total minimal price around 630000 $ without profit Alliedcontrol.
1400 kW per one container 40 ft. Power consumption AM BE200 0,73 from the wall, if we use high efficient PSU compuware (with lead time 8-12 week

) around 1,9 PH\s. We need 192000 $ only on PSU. 1,9 PH * 0,49 $ per GH\s = 930000 $ only chip. We need order electronic components, PCB, smd, router, cable. around 0,18 $ per Ghash (342000 $)
around 1100 $\th without profit alliedcontrol. Or 0,45 $ only for cooling system without profit alliedcontrol. If you have estimate calculate you can show it.