BORZALOM 777
Question 2.What is the expected timeframe for setting up and auctioning the L1 nodes? Will that be aligned with the level 2 and 3 nodes?
After the STaTiC+PoSign test closed (where we use manual registered STaTiC-s ) then the next test will be the test of STaTiC registration. Each level ( L1,2,3) will be open. The original Level1 STaTiC-s was added to genesis block but all other positions will be available. I don't want wrote deadline of tests but i hope to these tests will be closed this year. This it also depends the teams who help the execute and evaluate of tests. I hope the first teams will be available shortly. If the STaTiC registration tests successed then i will add this code to the system immediatly. And all level of registrations will be available after.
So after a successful STaTiC+PoSign test (which is taking place promptly), all STATIC nodes will be open for registration. Hopefully, this will all happen before the end of the year.
Yes, things are moving ahead quite well. If no roadblocks slow us down, maybe we can see this. But, keep in mind he is not setting a date and it could be longer. It will depend on what happens during the tests.