Post
Topic
Board Group buys
Re: [Special Group Buy - Spondoolies-Tech SP30 pre-order] Specs: 0.83$/GH + 0.46W/GH
by
hardhouseinc
on 30/04/2014, 07:46:52 UTC

With the SP30 requirements I think I will need to get a 200V 60amp breaker
installed pretty soon??

I currently have only 100V 50hz 60amp breaker.


we've been discussing hosting options on the SP-Tech ANN thread.. I do believe you would be cheaper taking the hosting option.

Ive got a couple local options here.
Could be building a data closet at a friends place who has power covered
in their lease.   LOL.  I hope they dont cut him off after month one at 6000W
LOL

I need to know though what these will run at if the voltage is 100V 50hz???
I can get the 200V breaker / line installed quite cheap / free with my lease agreements I believe
so I guess well see how it goes.