The question is does the gear do 5th or 4th?
5th would call for 17% refund
4th would call for 33% refund.
Actually, it would call for a higher refund as the power efficiency would also be impacted by either 17% or 33% (in your example).
It would call for an additional 500$ refund if the power efficiency would be off by 17%. (calculated on a basis of 100$/kW/m hosting cost and maximum power draw of 2.7kW at the wall, over one year only)
This is a conservative estimate, but let´s wait until final specs are released.